The height of the dam was 116.7 ft. and was provided with a by-wash of 394 ft. in length, and outlets for irrigation formed by four cast iron pipes of 31½ in. diameter through the dam. It was composed of rubble set in hydraulic mortar, the latter composed of two parts of sand to one of hydraulic lime.
As regards masonry dams, the question of success does not seem so much to depend upon their design, as far as the mere determination of the suitable profile or cross section is concerned, as that has been very exhaustively investigated, and fairly agreed upon, from a mathematical point of view, but to be principally due to the correctness of the estimate of the floods to be dealt with, and a sufficient provision of by-wash allowed for the most extreme cases; and, lastly, perhaps the most important of all, the securing a thoroughly good foundation, and a careful execution of the work throughout.
Bearing in mind the sudden and great floods to which dams constructed in such situations must be subjected, and, if the valley be very narrow, the probability that sufficient space at the side for a by-wash will be difficult to obtain, it would seem reasonable that in the calculation for their section allowance should be made for the possible condition of the whole length of the dam being converted into a weir, over which the waters may flow without risk of injury to the dam, to a depth of, say, at least twice that ever probable.
Word Of The Day
Others Looking