Bents in place on Girders C carrying Surface Railway. East and West sides of Avenue excavated down to Sub-Grade and Five rows of Permanent Steel in place on each side. Bents erected on Permanent Steel to catch ends of Girders C while 2 outside Concrete Piers are removed and 6th row of Permanent Steel on each side is put in place. No. 5

The east side was excavated down to sub-grade, the east portion of the south abutment was constructed, and six rows of the permanent steel viaduct were erected.

The chief defect in our otherwise sound social system, is the want of fusion between the class of employers and employed. As some other countries are subject to the more serious evil of being without a middle-class between the aristocracy and the common people, so we want a sub-grade, as it were, between the middle and the working classes.

The disposal trestle was maintained in this position until such time as it would interfere with the excavation, and then the tracks were abandoned. This was done on November 11th, 1908. On August 30th, 1908, a cut was made under Ninth Avenue at sub-grade, and cars could then be run from Seventh to Tenth Avenue at sub-grade.

The old church at No. 236 West 34th Street, between Seventh and Eighth Avenues, was turned over to the New York Contracting Company-Pennsylvania Terminal for a power-house to supply compressed air for use on the Terminal Station work between Seventh and Ninth Avenues and the work below sub-grade as well as that on the Terminal Station-West.

"I want a sub-grade foreman at seven dollars eight hours! "I want skinners, muckers, hard-rock men for Washington. I want lumberjacks for Washington long job good pay! I want hard-rock men for Alaska the harder the better. And I want " Here Orr Tweet grasped the enthusiast's sleeve. "How about those jerkline skinners for southern California?" he asked. "Saw it in the paper."

The last blast, to complete the excavation to sub-grade at this point, had been fired in the afternoon of the same day, and the mucking was practically completed. Great care had been taken in excavating near this point, as it was evident that the rock was not of a very stable character, but, when the excavation had been completed, it was thought that the rock remaining in place would stand.

The sides of the avenue were then excavated to sub-grade, and the permanent steel viaduct was erected on both sides of the avenue as close as possible to the central rock core.

At three points south of 32d Street and at one point north of 32d Street near Tenth Avenue, cuts were made in the rock to sub-grade, and from these cuts, together with the cuts on the west side of Ninth Avenue, all widening out was done and the excavation was completed.

View looking toward Ninth Ave. from South side of 31st St., 200 feet West of Ninth Ave. TW 88, P.T. & T.R.R. Co. N.R. Div. Terminal Station West. TW 95, P.T. & T.R.R. Co. N.R. Div. Terminal Station West. View under Ninth Avenue looking Southward from 100 feet South of center line, showing underpinning of Ninth Avenue structure taken at sub-grade.