Although only one foot in thickness it contained five hundred and eight cubic feet of granite in outward casing; eight hundred and seventy-six cubic feet of Mylnefield stone in the hearting; one hundred and four tons of solid contents; one hundred and thirty-two superficial feet of hewing in the face-work; four thousand five hundred and nineteen superficial feet of hewing in the beds, joints, and joggles; four hundred and twenty lineal feet boring of trenail holes; three hundred and seventy-eight feet lineal cutting for wedges; two hundred and forty-six oaken trenails; three hundred and seventy-eight oak-wedges in pairs.

Having been enabled to-day to get the dimensions of the foundation, or first stone, accurately taken, a mould was made of its figure, when the writer left the rock, after the tide's work of this morning, in a fast rowing-boat for Arbroath; and, upon landing, two men were immediately set to work upon one of the blocks from Mylnefield quarry, which was prepared in the course of the following day, as the stone-cutters relieved each other, and worked both night and day, so that it was sent off in one of the stone-lighters without delay.

Having been enabled to-day to get the dimensions of the foundation, or first stone, accurately taken, a mould was made of its figure, when the writer left the rock, after the tide's work of this morning, in a fast rowing-boat for Arbroath; and, upon landing, two men were immediately set to work upon one of the blocks from Mylnefield quarry, which was prepared in the course of the following day, as the stone-cutters relieved each other, and worked both night and day, so that it was sent off in one of the stone-lighters without delay.

Having taken the dimensions of the first or foundation stone, a model of its figure was made, and this was taken by the engineer in a fast-rowing boat to the work-yard at Arbroath: two men were immediately set to work upon one of the blocks from the Mylnefield quarry, and as the stone-cutters relieved each other, and worked without intermission, the stone was soon prepared, and sent off next day in one of the stone-lighters.

The winter months were occupied in preparing the upper courses; but in consequence of severe frosts, several excellent and valuable stones from the Mylnefield quarry were destroyed by absorption of moisture from the air, which moisture expanding in the act of freezing, split the stones, and rendered them useless.

The granite was from the Rubislaw quarry, and was so compact, that it contained only about thirteen and a half cubic feet to the ton. The sand-stone was from the Mylnefield quarry, and contained fifteen feet to the ton. As soon as the weather would permit, the operations of the second season commenced at the rock. The arrangements for carrying on the works were made on an improved scale.